Jump to content
When you buy through links on our site, we may earn an affiliate commission.
  • Current Donation Goals

Cali Project build so far....


Cortebert

Recommended Posts

No Plexi yet....but taken the project a stage further and soldered the Lugs and Crown Tube...

The bezel is taller than the standard Silix Cartel type and also wider on the top surface near were the plexi goes. The strap is by Donerix and has the hidden rivets which means this strap can be added and removed from solid lug bars....

Stages I & II

3646authcase-021.jpg

3646authcase-022.jpg

3646authcase-023.jpg

3646authcase-024.jpg

3646authcase-025.jpg

3646authcase-026.jpg

3646authcase-027.jpg

Stage III (soldered lugs crown stem and polishing)

3646authcase-030.JPG

3646authcase-033.JPG

3646authcase-034.JPG

3646authcase-035.JPG

3646authcase-036.JPG

3646authcase-037.JPG

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...
Please Sign In or Sign Up