Jump to content
When you buy through links on our site, we may earn an affiliate commission.
  • Current Donation Goals

Namgorg Tactical Scuva...................


MALDONADO

Recommended Posts

.

.

gratitude

A dream and those who have come true.

MILITARY_PORTADA_1.jpg

tactical divers

At the outset, his mission was to take action at once on the coast and enemy ports and pave the way for landing, eminentementes water features. As time went on the tasks were modified.

Currently, its primary mission is the recognition of the enemy, hydrographic and geogafrico upliftment of disputed areas, amphibious command ejecusión raids, demolitions underwater structures and ships in port areas, enemies, demarcation prior to the landing beaches of the Marine Corps, SAR Missions (search and rescue) high risk and counterterrorism.

01_P1010389.jpg

01_P1010397.jpg

01_P1010393.jpg

Tactical Divers have all the art equipment necessary for their performance. The team consists of personnel parachutes, uniforms of all types of environments, portable GPS, night vision and modern communications equipment.

They can be deployed from submarines, but also are trained to be introduced by air and naval diverse. For your arrival at the point of action have: mini-submarines for two divers, individual propellers underwater breathing apparatus with recycling of air (no bubbles), folding kayaks, boats and speedboats Zodiac artillery.

01_P1010403.jpg

01_P1010413.jpg

01_P1010407.jpg

The arrival should be as stealthy and unobtrusive as possible so as not to attract attention, because the theater will always be under absolute surveillance and armed presence. We will use the devices listed arrival achieving invisible as possible.

After completion of the mission shall be treated, if possible, to return by the same means of arrival. If you have found this group is prepared to make extensive use of firepower in an orderly retreat covered by machine guns, grenades, smoke extraction units.

Each operating unit of tactical divers compene of 3 operating groups of 16 men with full equipment and logistic support group.

01_P1010410.jpg

01_P1010416.jpg

01_P1010425.jpg

While the members of this elite group is able to operate on land and using air as infiltration, water is their natural environment and where they train most of the time, using submarines as particularly ideal platform for transport subtle of men and material.

As an integral part of training, the unit performs exercises in the marine theater, where they are put into practice all the knowledge about tactics and techniques, and where man is brought into contact with the environment in which you must act if a conflict.

01_P1010429.jpg

01_P1010422.jpg

01_P1010433.jpg

NamgorF 1000 Ficha Técnica

- Edición limitada de 5 unidades

- Ensamblado en España

- Caja de acero inoxidable 316 con tratamiento de arenado

- Cristal zafiro 3mm

- Bisel unidireccional con lumen en punto

- 45mm diametro.

- Pasadores reforzados

- Corona a las 4.

- 22mm entre asas

- Valvula Helio automática.

- Calibre Miyota 8215 mvt automática.

- Juntas suizas

- WR mínimo 200 m (probado)

- WR Max. 1000m (no probado aún)

-Esfera y manecillas con lumen de doble capas aplicado manualmente.

- Correa de buceo de caucho tipo Isofrane ( de camino )

01_P1010448.jpg

01_P1010443.jpg

01_P1010436-1.jpg

Proyect

We all keep in our memories and the things we produce or accumulate the memory of time, but like the preserve of destruction did why not a device to keep our own time?

The idea took shape, a challenge .. a dream .. a project where a handful of friends interact, share ideas, philosophies, experiences and opinions, and a whole lot of laughs.

01_P1010458.jpg

01_P1010451.jpg

01_P1010453.jpg

Since it was our first project was decided to establish a maximum cost of 250 Euros. The problem was that having an approved cost not find anyone to do a decent various low-cost, after months, they decided to buy an existing base clock, strip, modify and customize the parts. So it was, and put the eye on the Tauchmeister T46. He polished the box with ceramic granules are completely changed the valve, polished rear, was designed and made a new dial, new shafts, super lumen, belt were changed springbars, 8215 Miyota synchronization, change together , waterproof watch, laugh, mosque, laughter, arguments, laughter, voting, laughter ..

01_P1010459.jpg

01_P1010462.jpg

01_P1010463.jpg

Componentes del proyecto

Creamos un foro para discutir y encauzar el proyecto.

- Fleed

- Qaz

- Malasartes

- Patrick

- Maldonado

01_P1010467.jpg

01_P1010469.jpg

01_P1010472.jpg

[Logbook

Born May 5, 2011 the team, creating a forum to discuss, learn a lot from each other

May 9, 2011 is established maximum total cost for our project

May 10, 2011 What kind of watch should be?

May 11, 2011 may be a diver

Decided May 13, 2011 will be an extremely diverse, we decided to use as a donor TauchmeisterT46

May 16, 2011 Photoshops different dial samples, each has a different idea

May 30, 2011 Engraving rear is simple and clean

June 4, 2011 In search of the bolts, there is little for our Miyota 8215

June 14, 2011 are requested and paid our Tauchmeister

June 16, 2011 was decided to change and modify the helium valve, highly exposed to shocks

June 22, 2011 The first donorwatch has been divided and now verify the strengths and weaknesses.

July 2, 2011 It has a name NamgorF.

July 4, 2011 lumen kind of use, has to be customized.

August 8, 2011 lumen kind of use, has to be customized

August 13, 2011 the hands are in charge

August 14, 2011 The lumen is white to daylight white and blue ice in the dark

September 12, 2011 The first dial (and designed) and the needles were lumean, looks good

September 25, 2011 are requested straps 22mm rubber dive Benarus

September 28, 2011 The first watch is assembled, it looks nice, we are proud

September 30, 2011 Namgorf 1 / 5 with full engraved caseback

October 1, 2011 Namgorf No. 2 / 5 complete game we Armix steel.

October 2, 2011 First dive of Namgorf

October 4, 2011 Test Isofrane belt, looks good, and takes great

October 9, 2011 Namgorf, 3 / 5 4 / 5 and 5 / 5 ready project completed

01_P1010483.jpg

00_P1010492.jpg

00_P1010496.jpg

00_P1010490.jpg

Well that's all .............

Lie ........ Our second project is in the kitchen of our feverish minds.

Reminiscent of old flyers will of the second world grerra?

Will be the envy of any formylated a pilot?

Help make decisions in a bridge?

Will be on the wrist of a diplomatic embassy cocktail?

Sat qui what .....................

02_P1010525.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...
Please Sign In or Sign Up